On Friday, October 30, volunteers from our local community together with representatives from the City of Longville, Barr Engineering, Cass Soil and Water and the DNR gathered together to complete the sandbagging of the rock arch rapids outlet (RAR). A flume was constructed downstream from the RAR in order to measure potential seepage leaking through the RAR structure. A sandbag line was then constructed just in front of the upper wier of the RAR itself. The sandbags will remain in-place for a period of at least two weeks to measure potential seepage as well as assess the impacts on lake levels. A huge thank you to all of the volunteers who made this possible.



















